Hercílio Luz Bridge faces partial closure over November 19–22 holiday weekend; north walkway remains open
The maintenance closure of the Hercílio Luz Bridge will close the main deck and the south walkway from 8:00 PM on Thursday, November 19, to 5:00 AM on Sunday, November 22, in Florianópolis. The advisory comes from the Santa Catarina State Government via the State Secretariat of Infrastructure and Mobility (SIE). The north walkway will remain open for pedestrians and cyclists throughout the period.
The work involves maintenance of the deck railing, the central span of the Hercílio Luz Bridge. The closure takes place during the November 20 long weekend, a national holiday.
When the closure begins and ends
- Start: Thursday, November 19, at 8:00 PM.
- End: Sunday, November 22, at 5:00 AM.
- Reason: deck railing maintenance.
- Responsible agency: State Secretariat of Infrastructure and Mobility (SIE).
What is closed and what stays open on the Hercílio Luz Bridge
- Main deck (central span): fully closed to traffic throughout the closure.
- South walkway: closed during the same period.
- North walkway: open for pedestrians and cyclists.
In practice, walking between the island and the mainland remains possible over the holiday weekend, but only along one side of the bridge. Anyone planning to use the south walkway must switch to the other side upon arrival at the entrance.
Holiday timing avoids vehicle closures on business days
The notice was released by the State Government on Monday, November 16. The SIE points out that Friday, November 20, is a national holiday. As a result, vehicle traffic will not be disrupted during regular business days. Reopening is scheduled for early Sunday morning at 5:00 AM, before the long weekend concludes.
The service takes place in the same year the bridge reached its centennial milestone.
Rain may postpone maintenance work
The SIE warns that operations may be postponed in the event of adverse weather conditions. The holiday forecast calls for vigilance: the Santa Catarina Civil Defense is tracking an offshore extratropical cyclone off the coast of Southern Brazil, which could cause storms with heavy rainfall between Friday, November 20, and Saturday, November 21. For Thursday, November 19, when the closure begins, isolated thunderstorms are forecast across all regions of the state.
Those planning to cross on foot or by bicycle over the holiday weekend should check State Government updates before leaving, as any postponement will depend on the weather.
Spending the long weekend in Floripa? With the Floripa24h app, you can build your itinerary around everything happening in the city.
Photo: Eduardo Valente/Archive/SecomGOVSC
With Florianópolis24h Guide, enjoy your trip to Floripa stress-free and save money.
Our interactive guide has everything you need to plan your trip and not miss any experience in the Magic Island. Over 200 curated places for you to create your personalized itinerary.
Discover the Guide →Related Posts
CONVIVE in Rio Vermelho: R$ 12.3 Million Project with Pool and CRAS Reaches Foundation Stage
Santa Catarina's first Community Center for Life will feature a semi-Olympic pool, sports court, CRAS, and healthcare services in Travessão. Construction set for 18 months; waste drop-off station remains open.
Hercílio Luz Bridge faces partial closure over November 19–22 holiday weekend; north walkway remains open
Main deck and south walkway close from 8:00 PM on Thursday (19) to 5:00 AM on Sunday (22) for railing maintenance. Pedestrians and cyclists can use the north side.
Summer Season 2026/2027: Lifeguards Are Already on Duty on SC Beaches and Peak Season Begins in December
Firefighters launched the preseason on November 9. Check the dates, how to find beaches with active stations via the app, and free services like wristbands for children.
Stay Updated on Everything About Floripa
Receive exclusive tips, news about beaches, events and more directly in your email.